Walton Radio Association
Minutes of the November Meeting
The meeting was called to order at the Walton Fire
Department building,
Reports
The minutes of the October meeting were read and approved.
The treasurer reported a balance of $3,188.92. The banking statement was reviewed by the Secretary. The treasurer’s report was approved as read.
Nets: CW –16 check-ins for October 2009. FM –17 check-ins for October 2009.
Old Business
The subject of the tower and antenna removal from the
W2TKB has offered a length of steel mast material for use at the new repeater site for improving the radiating system there. It was suggested by K2EZK that one of the collapsible field day masts be tried as an antenna mount at the new location on a trial basis in advance of installing a more permanent mast for the mounting of the antenna. A motion was made, seconded and approved allowing for the purchase of a new antenna for the repeater if the existing tower mounted antenna is damaged during the lowering of the Woodlawn Road tower.
A discussion of the possible use of solar power at the new
repeater site as an alternative to commercially available power followed. A similar system had been tried with very
limited success at the
N2WDV thanked all who participated in this year’s Harvest Festival. The set up was good and all groups worked well together for a successful exercise. The WX was cold and public participation was less this year than in previous years. A total of 34 “contacts” were made on the local CW channel at the site. In this case, participant’s names were communicated via CW. Operating HF and VHF stations were featured at the Harvest Festival.
New Business
W2RRK stated that RACES equipment may be installed at
It was reported that the W2QP donation had not yet been received.
The next meeting is planned for
The meeting was adjourned at
AB2IC provided those present with an interesting
presentation of his travels to the
Respectfully submitted,
WB2JOW Secretary